Projects
About Project
Haicang Tunnel
The terminal connection project of the main island of the Haicang Tunnel is located at the intersection of Chenggong Avenue and Fangzhong Road. The mainline is about 1.7 kilometers in length. The main construction content is the upgrading and reconstruction of the existing Chenggong Avenue and the airport interchange and the reconstruction of the roads along the route, traffic, and greening. The total investment is about 690 million yuan.
- Contractor
Dacheng Engineering Construction Group Co., Ltd
- Completion Date
January 2019
- Location
Fujian Province, China
Share This Project