Projects

About Project
Changchun Metro Line 2 West Extension
The west extension line of Changchun Metro Line 2 has a total length of 2564.5 meters. The starting point of the project is the south end of the Bus Park Station, which is connected to the south end of the Xihu Station of Line 2 under construction. The start date is October 18, 2017, and the completion date is September 30, 2020. The total construction period is 1079 days and the investment is 613 million yuan.
- Contractor
China Railway 14th Bureau Group Tunnel Engineering Co., Ltd
- Completion Date
September 2020
- Location
Jilin Province, China
Share This Project